De Havilland Road
Date of completion: Expected 14th August 2015
Region: Hobsonville Point, Auckland
Size of Project: 450 sqm more or less
Type of Project: Early Childhood Centre
Architect: Collingridge and Smith Architects (UK) Ltd
Contractor: Rob Howdill, Miro Construction
This is a single storey portal frame structure with slab on grade, and light weight roof. The structure had being designed to importance level 3 (IL3) although it’s not a Ministry of Education building. The complex structural geometry demanded accuracy. Sullivan Hall achieved this using 3D Revit structure software.